From west to east with Howe Green access covers

Building Products Index Ltd access covers Leave a Comment

View the Howe Green entry on BPi

Visit the Howe Green website

Howe Green has supplied over 400 access covers to Tier 1 contractors working on Europe’s largest construction project – Crossrail. The new Elizabeth line will comprise 118 kilometres of track running through London and the South East and is set to reduce average journey times significantly. The Elizabeth line will open in December 2018 when services commence through central London.

Tier 1 contractor Laing O’ Rourke has specified over 60 of Howe Green’s 7500 Series Multipart Stainless Steel Floor Access Covers for Tottenham Court Road station.

Howe Green 7500 Series Stainless Steel Multipart Floor Access Cover - Crossrail - amendedThe large 4 part units were precision made to order to ensure that they would be a perfect fit.  Installed by specialist stone contractor Vetter UK, the covers have been infilled with granite to match the surrounding area.  Supplied with barrel lifting points the covers fit flush with the flooring to reduce the risk of slip and trip hazards.

The 7500 Series can withstand up to a 5 tonne pneumatic wheel loading and can be supplied as a single cover, in duct runs or as a multipart.  Standard sizes are available from stock or can be custom made to order if a specific size or loading is necessary.   Options are available for a 3 hour fire rating BS 476: Part 20 1987 on stainless steel single covers or 2 hours on duct and multipart covers if required.  The covers can also be supplied double-sealed to meet the highest standards of hygiene and security.

For more information please call 01920 463230 or visit www.howegreen.com.

Leave a Reply

Your email address will not be published. Required fields are marked *