View the Axis Entrance Systems entry on BPindex
Visit the Axis Entrance Systems website
INDUSTRY: Healthcare
CLIENT: York and Scarborough Teaching Hospitals NHS Foundation Trust
CONTRACTOR: IHP (Vinci Construction & Sir Robert McAlpine)
ARCHITECT: Arcadis
INTRODUCTION
If you visited the Axis Entrance Systems stand at the recent Healthcare Estates Exhibition, you’ll have seen their multi-award-winning Flo-Motion® range of low friction, manual sliding doors in action.
This case study highlights, not only the excellence of the Flo-Motion® range that is now in 100+ hospitals across the UK and Ireland, but also the benefits of using Axis with their unrivalled technical experience and expertise, as innovators, designers, manufacturers and installers – the whole package from start to finish!
PROJECT
The £47 million transformation of the new Urgent and Emergency Care Centre (UECC) at Scarborough Hospital, for York & Scarborough Teaching Hospitals NHS Foundation Trust.
This was a significant project, as the investment in the new state-of-the-art UECC was the largest ever made in patient care, by UECC’s York & Scarborough Teaching Hospitals NHS Foundation Trust.
For our part, working with main contractor, IHP (Integrated Health Projects) and architects, IBI Group – now Arcadis, our brief was to supply and fit 31 doors and glazed screens for the project.
CHALLENGES
Following the initial enquiry, which was for our Flo-Motion® B32 bi-parting and T100 telescopic doors, we noted during the design and pre-order stage that the doors would be sliding over timber glazed screens not walls, which wouldn’t be possible and required a rethink. As well as the challenge for this particular door set, there was the common challenge of space-saving for all door sets on the project.
On our advice, Flo-Motion® B01 bi-parting door sets replaced the door sets originally specified. The reason for our recommendation was that the B01 doors would allow us to incorporate two glazed fixed panels to solve multiple issues, including shearing actions, location of supports and aesthetics.
Our ability and capability to manufacture five hybrid versions of our Flo-Motion® B011 door sets – each with one of the bi-parting doors sliding over the glazed screen and part of the wall, with the other sliding completely over a wall – enabled us to overcome all of the space saving issues too.
Overall, we manufactured, supplied and installed the following:
- 7 Flo-Motion B32O (bi-parting doors sliding over a wall)
- 18 Flo-Motion B01 (bi-parting doors sliding over glazed screens and walls)
- 5 Flo-Motion B011 (bi-parting doors with one sliding over a glazed screen and wall, the other over a wall)
- 1 Flo-Motion T100 (telescopic door)
OUTCOME:
Our Flo-Motion® door-sets and our glazed panels provide many significant benefits for patients, staff and visitors to the new UECC at Scarborough Hospital, including:
- Excellent light transfer to maximise the feeling of spaciousness.
- Flexibility for clear patient/staff visibility or patient privacy with the integrated blinds
- An attractive, efficient, effective & improved environment for staff, patients & visitors.
EXPLORE MORE AXIS HEALTHCARE PROJECTS
View more Axis case studies of highly successful new build and refurbishment projects in the healthcare sector, here: https://axisentrances.com/case-studies/
CONTACT AXIS ENTRANCE SYSTEMS
T: 01604 212 500
LinkedIn: https://www.linkedin.com/company/axis-automatic-entrance-systems-ltd/


