Skip to content
BPindex — The Largest Building Products Directory in the UK

Automated systems

New Transport Hub Opens with Effortless Automated Access (July 2026)

Building Products Index Ltd Automated systems, Automatic door system Leave a Comment

View the TORMAX UK entry on BPindex

Visit the TORMAX UK website

TORMAX UK has delivered a complete door automation solution for Frostree Ltd at the new Bishop Auckland Bus Station, on behalf of Durham County Council. The installation incorporates a combination of TORMAX iMotion door operators to automate 12 key passenger access points, creating efficient movement from the bus station interior, through to external boarding areas.

The installation includes 8 iMotion 2202a single sliding door operators, 2 iMotion 2203 bi-parting door operators and 2 iMotion 2203 single sliding door operators. Specified for their robust engineering and compact design, iMotion drives are designed to meet the demands of high-traffic environments where durability and ease of operation are essential.

Featuring intelligent door drive technology that allows precision control, the systems are designed to optimise energy efficiency. The iMotion motor’s gearless and brushless design reduces mechanical wear, minimises maintenance, and delivers consistent, reliable performance throughout an extended lifespan.

Funded through the Government’s Future High Streets Fund, secured by Durham County Council, the new Bishop Auckland bus station is part of an £11.8m investment in the town’s transport infrastructure, supporting improved connectivity and long-term regeneration. The modern passenger facility enhances the experience of bus travel by providing an accessible and comfortable environment for passengers before boarding.

As a busy public facility, the station needs to accommodate a wide range of users, including passengers with mobility challenges, wheelchair users, parents with buggies and travellers carrying luggage. The automated sliding door systems support inclusive design principles by providing controlled, effortless access whilst maintaining smooth passenger flow.

A Swiss company, TORMAX installed Europe’s first automatic door in 1951 and today designs and manufactures a complete range of automatic  door systems for applications

worldwide. The in-house engineered range of iMotion operators provide solutions that meet both the architectural aspirations and practical requirements of modern buildings.

Working alongside TORMAX on the project was Frostree Ltd, a leading manufacturer of architectural aluminium. With expertise in delivering bespoke glazing solutions, Frostree delivers high-quality fabricated systems for commercial and public-sector environments where precision, performance and finish are critical.

The Bishop Auckland bus station project shows how collaboration between fabricators and automation experts can deliver functional, durable access solutions that also improve user experience.

Cllr Tim McGuinness, Durham County Council’s Cabinet member for rural, farming and transport, said: “Bishop Auckland’s new bus station is fitted with modern, up-to-date facilities and will be accessible to all passengers. The new station will play an important role in supporting the town’s regeneration journey, while serving as a positive welcome for visitors travelling to see the area’s growing culture, heritage and events offer.”

GEZE UK Shortlisted in 11 Categories at the National Fenestration Awards 2026

View the GEZE entry on BPindex

Visit the GEZE website

GEZE UK is proud to announce that it has been shortlisted across an impressive range of categories at the prestigious National Fenestration Awards 2026, recognising both individual excellence and product innovation across the business.

GEZE UK has received nominations spanning sales, customer service, leadership, and technical innovation, highlighting the strength and depth of talent within the organisation, as well as our continued commitment to delivering high-quality solutions for the built environment.

The full list of categories GEZE UK has been nominated for are:

  • BDM/Sales Executive of the Year – Andy Iredale, GEZE UK
  • Customer Service / Operations Person Of The Year – Tracey Hickling, GEZE UK
  • Customer Service Company of the Year  – GEZE UK
  • Managing Director/Director Of The Year – Kaz Spiewakowski, GEZE UK
  • Door Component Of The Year – UFO NT, GEZE UK
  • Fire Door Product of the Year – Slimdrive EMD-F, GEZE UK
  • Hardware Company Of The Year – GEZE UK
  • New Product Of The Year – MCRdrive, GEZE UK
  • Office Manager Of The Year – Tracy Mason, GEZE UK
  • Window Component Of The Year  – myGEZE Control, GEZE UK
  • Young Person Of The Year – Hope Kendall, GEZE UK

How to Support GEZE UK

The process is simple, simply visit the official National Fenestration Awards website, enter your details and select the dropdown for each respective award and press submit.

We appreciate all the support.

[VOTE FOR GEZE UK]

About the National Fenestration Awards

The National Fenestration Awards are widely regarded as one of the industry’s most respected accolades, celebrating the very best in the UK’s window, door, and glazing sector. Winners are determined by industry votes, making these shortlistings especially meaningful as they reflect recognition from peers and customers alike.

GEZE UK extends its congratulations to all fellow finalists and looks forward to the awards ceremony later this year.

Q&A with Kaz Spiewakowski: Reflecting on 2025 and Looking Ahead

Building Products Index Ltd Automatic door, Automatic door system Leave a Comment

View the GEZE UK entry on BPindex

Visit the GEZE UK website

With 2026 now underway, it feels like the right moment to pause, reflect and look ahead. The past year presented both challenges and opportunities for the construction and building products sector, and this was no exception for GEZE UK. To kick off the year, GEZE UK Marketing Manager Lewis Tandy caught up with Managing Director Kaz Spiewakowski to discuss the company’s performance in 2025, plans for the year ahead, his personal journey and his outlook on the industry.

Lewis Tandy (LT): Hi Kaz, thanks for sitting down with me today. Let’s start with the big picture, how was 2025 for the business?

Kaz Spiewakowski (KS): Hi Lewis, no problem. Overall, I’d say 2025 was another positive year for GEZE UK. It wasn’t without its challenges and despite difficult trading conditions we made real progress across the business. There was significant uncertainty in the market but we stayed focused on doing the right things which really showed in our results.

Importantly, we didn’t just focus on turnover. We focused on improvement across the business, including improving our relationships with customers and partners, which puts us in a much stronger position heading into 2026.

LT: What were some of the key achievements or highlights from last year?

 KS: There were quite a few, actually. Firstly, from a business point of view, we improved our customer service which is an ongoing process requiring training and change in behaviour and while we have improved, we intend to continue this improvement in the coming year.

I’m also pleased to say that we exceeded our profitability targets for the 2024/2025 financial year, which is a good result and not to be underestimated in what is a tough economic environment. Clearly its pleasing to say that we are on a strong financial base which while keeping our shareholders happy, allows us to invest in people and processes to improve the business but also gives our suppliers confidence in dealing with GEZE.

It was great to see GEZE recognised at the National Fenestration Awards, where we won ‘Fire Door Product of the Year’ for the Slimdrive EMD-F Powered Swing Door Drive.

Also, in September we successfully completed recertification by LRQA for ISO 9001, 14001 & 45001, which is a tremendous achievement and vital in assisting us operationally in a world where compliance and validation of compliance is critical to success.

Finally, 2025 saw GEZE undertake significant CSR activities, in particular our charity work on behalf of Kids Village and Lichfield Canal Trust was fantastic to see.

LT: Were there any particular challenges the business had to navigate in 2025?

KS: Like most businesses, one of our biggest challenges in 2025 was managing increased costs across the board. From materials and logistics through to energy and operational expenses, pressures continued to rise, and that’s something the whole industry has had to navigate.

The key for us was finding the right balance, absorbing costs where we could, being transparent with customers and making smarter decisions internally. It pushed us to look closely at how we operate, improve efficiencies and focus even more on delivering great value and service to our customers.

LT: Switching gears a bit, can you tell us about your background and how you ended up as Managing Director at GEZE UK?

KS: My background and Education is an engineer, both apprentice trained and I achieved a BEng in Mechanical Engineering from the University of Birmingham. Although, I always knew that pure engineering was not my future and I quickly set about rounding out my experience with operational and commercial roles. I held MD roles in the precision engineering sector supplying a wide variety of challenging sectors, including electronics and automotive, which was a great experience and has set my standards when I came in to the supply of products in the construction sector, firstly with Exidor and latterly GEZE. I’ve always been ambitious and willing to test my ability to adapt and learn, which took me from Exidor to what was an attractive opportunity with a well respected German manufacturer and I’ve been here now for 13 years.

 LT: How would you describe your leadership style?

KS: You’re probably better asking some of your colleagues but I think I have an open style. My communication tends to be clear and direct. I don’t believe in micro-managing as I believe managers should manage, the clues in the title. That doesn’t mean that I’m not close to the business but people tend not to enjoy their role if they are constantly told what to do. I believe you need to be empowered to make decisions but clearly there needs to be logic behind the decision and if it goes wrong then that’s ok as long as we learn from the mistake.

Finally, I hope that I facilitate people to become better, my aim is to always leave a business in a better position than I found it when I joined and a lot of that is due to the people and the culture. As I said, you probably need to validate this with your colleagues!

LT: Turning to 2026, what’s the focus for GEZE UK?

KS: The main theme for 2026 is improving processes and efficiencies to deliver sustainable, sensible growth. We want to keep moving forward, but in a way that’s right for the business and our customers.

We’re planning to introduce some exciting new products, including the TS 7000 door closer, “my GEZE Control” a smart solution for networking doors, windows and safety systems, while continuing to build on the strengths of our existing range, like our PACE [Pedestrian Access Control Equipment] line. As always, our focus is on delivering solutions that help create safer, more efficient, and better-performing buildings.

Education will be a major focus for us in 2026. We’re keen to expand our CPD offerings, helping architects and specifiers tackle increasingly complex requirements with confidence.

We’re also committed to investing in our people and strengthening our team where needed, ensuring we continue to deliver the best value and expertise to our customers.

In short, there is lots planned for 2026, so watch this space!

LT: What’s your outlook for the industry as a whole over the next few years?

KS: I think there’s nervousness about the year ahead but overall the sector is forecast to grow, albeit a small amount, which is positive. Cost pressures and regulatory requirements aren’t going away but there’s still significant activity in the sector with a real focus on improving building performance and delivering better long-term value, which is a positive thing.

At the same time, the industry will need to address the ongoing skills gap. Finding and developing young talent to replace experienced tradespeople retiring from the sector is going to be crucial. Collaboration, training and creating clear career paths will be key if the industry is going to keep up with demand and continue delivering high-quality projects.

LT: Finally, is there anything else you’d like to say as we start 2026?

KS: Just a genuine thank you. To our customers, partners, and suppliers, your support and trust mean a lot to us. We’re excited about what’s ahead and committed to continuing to deliver the same level of service, quality and expertise people expect from us.

We’re looking forward to building on what we’ve achieved and making 2026 another strong year.

For any general enquires, please contact us via our website or email:

Website: www.geze.co.uk/en

Email: info.uk@geze.com

TORMAX IP65 & IP68: Automatic Door Drives for Any Environment

Building Products Index Ltd Automated systems, Automatic door system Leave a Comment

View the TORMAX entry on BPindex

Visit the TORMAX website

Setting a new standard for hygiene, reliability, and durability, TORMAX introduces a comprehensive range of three automatic swing door drives and four sliding door systems, all designed to meet the highest IP65 and IP68 protection ratings.

Engineered to withstand even continuous immersion in water and to fully resist dust, dirt, and splash water, these robust door drives also perform reliably across a wide temperature range, from locations subject to high levels of humidity, right through to arctic chill.

Swiss precision engineering guarantees smooth, quiet movement, long service life, and minimal maintenance. Adjustable speeds, opening profiles, and programmable control options allow users to meet functional and regulatory requirements without compromising aesthetic design

Constructed with stainless steel components or full stainless steel housings, these corrosion-free drives have been successfully specified in diverse projects worldwide.

Capable of enduring intensive cleaning with high-pressure water jets, TORMAX IP65/68 door drives are the perfect solution for environments requiring the highest levels of hygiene, such as hospital operating theatres, laboratories, and clean rooms.

Equally suited to consistently wet conditions, including swimming pools, offshore platforms, and cruise ships, these drives deliver reliable automation even in challenging settings. Their resistance to extreme temperatures also makes them ideal for use in saunas, greenhouses, and cold storage units.

Offering exceptional design flexibility, the TORMAX range of IP65 and IP68-rated swing and sliding door operators provides architects and specifiers with versatile solutions — including the option for completely invisible swing door automation. Installed discreetly within the floor casing, the iMotion 1401 preserves clean architectural lines while delivering outstanding performance.

These high-performance drives can support door leaves weighing up to 600 kg and spanning widths of up to three metres.

Axis Entrance Systems Case Study: Ipswich Hospital Urgent Treatment Centre

Building Products Index Ltd Automated systems, Automatic door system Leave a Comment

View the Axis Entrance Systems entry on BPindex

Visit the Axis Entrance Systems website

INDUSTRY: Healthcare

CLIENT: East Suffolk & North Essex NHS Foundation Trust

CONTRACTOR: ARCHITECT: Barnes Construction KLH Architects Ltd

PROJECT:

The design and construction of a brand new Urgent and Emergency Care Centre at Ipswich Hospital for East Suffolk & North Essex NHS Foundation Trust.

The new Centre houses a dedicated urgent treatment centre (UTC), which is where our involvement on the project was, as well as a new emergency department (ED).

Working with KLH Architects and main contractor, Barnes Construction, our brief for the project was to design, supply, install and commission the low friction, manual sliding doors required for the UTC, specifically to the bays in the Resus and Majors areas.

CHALLENGES:

The main challenge for this project was a common one to all construction sites, which was completing installation and commissioning whilst other trades were also trying to complete their work. Great project management from main contractor Barnes Construction ensured this and other challenges were navigated smoothly and quickly, and the project delivered on time.

SOLUTION:

The solution to our brief was the specification of two types of door-sets from our award-winning Flo-Motion® range. The door types and their features included:

  • Seventeen Flo-Motion® T55 telescopic doors with a 1590mm clear opening width. Average force test reading on these doors was 9.11N
  • Two Flo-Motion® E32 single sliding doors with a 1650mm clear opening width. Average force test reading on these doors was 9.85N
  • The doors were finished in RAL7012 Basalt Grey with 600mm satin stainless-steel handles.
  • All doors were fitted with 32.8mm double glazed units incorporating interstitial blinds operated by a slide magnet for “tilt and turn” facility.

OUTCOME:

Our Flo-Motion® door-sets help realise the vision of KLH Architects and main Contractor, Barnes Construction, providing several significant benefits that optimise the experience for patients, staff and visitors. These include:

  • A department with excellent light transfer & a feeling of spaciousness.
  • Visibility between patients & staff with the blinds providing privacy options.
  • The ease of operation of our doors with an average force-test reading of just 9.19N.

Glass Entrance Lobby Creates Automatic Entrance to Oxford Chapel (March 2025)

Building Products Index Ltd Automated systems, Automatic door, Automatic door system Leave a Comment

View the TORMAX entry on BPindex

Visit the TORMAX website

Working with commercial glazing specialists IQ Projects, TORMAX has delivered discrete and reliable automation to a new draught lobby installed inside the main entrance to the 13th century chapel at Merton College, Oxford.

Successfully reducing heat loss from the building whilst improving the internal ambient temperature, the elegant glass lobby features two sets of automatic sliding doors. Working in tandem, the doors are powered by in-house designed TORMAX iMotion 2202.A operators.

Helping maintain the heritage aesthetics, the iMotion 2202.A has an installation height of just 100mm which, along with a slender guide track, makes it suitably unobtrusive. Reliable AC motor technology combines with a state-of-the-art microprocessor control system to deliver near-silent movement quality, for an appropriate entrance into this ancient place of worship.

An exquisite example of Gothic architecture, Merton College Chapel has stood as a place of worship at the heart of this ancient College, for over 750 years. Today the Chapel is home to a lively and diverse Christian community with a busy programme of daily services and concerts.

With sustainability a targeted priority throughout the College, it was recognised that the existing entrance doors were a source of avoidable heat-loss. Seeking a modern solution that would create a welcoming atmosphere without compromising the building’s historic charm, IQ Projects was contracted to install a thoughtfully designed glass lobby.

“We have worked with IQ Projects on a number of different installations,” comments Simon Roberts, MD for TORMAX. “This glass lobby is a truly elegant solution with the automatic sliding doors offering seamless and unhindered access for everyone.”

Reliability is a priority for any automatic entrance and the Chapel doors should only require minimal maintenance thanks to the advanced designed of the iMotion operator. Featuring a motor that has none of the working parts that easily wear out, such as gears and brushes, the iMotion life expectancy is second to none.

TORMAX UK provides high-quality automatic door solutions, including sliding, swing, and revolving doors, with expert installation, maintenance, and repair services for commercial applications.

Axis Entrance Systems Case Study: York & Scarborough Teaching Hospitals NHS Foundation Trust

Building Products Index Ltd Automatic door system, Doors, Sliding Leave a Comment

View the Axis Entrance Systems entry on BPindex

Visit the Axis Entrance Systems website

INDUSTRY: Healthcare

CLIENT: York & Scarborough Teaching Hospitals NHS Foundation Trust

CONTRACTOR: IHP (Integrated Health Projects)

ARCHITECT: IBI Group – now Arcadis

PROJECT:

The £47 million transformation of the new Urgent and Emergency Care Centre (UECC) at Scarborough Hospital, for York & Scarborough Teaching Hospitals NHS Foundation Trust.

This was a significant project, as the investment in the new state-of- the-art UECC was the largest ever made in patient care, by UECC’s York & Scarborough Teaching Hospitals NHS Foundation Trust.

For our part, working with main contractor, IHP (Integrated Health Projects) and architects, IBI Group – now Arcadis, our brief was to supply and fit 31 doors and glazed screens for the project.

CHALLENGES:

Following the initial enquiry, which was for our Flo-Motion® B32 bi- parting and T100 telescopic doors, we noted during the design and pre-order stage that the doors would be sliding over timber glazed screens not walls, which wouldn’t be possible and required a rethink. As well as the challenge for this particular door set, there was the common challenge of space-saving for all door sets on the project.

SOLUTION:

On our recommendation, it was agreed that our Flo-Motion® B01bi-parting door sets should replace the door sets originally requested, as they would enable us to incorporate two glazed fixed panels to solve multiple issues, including shearing actions, location of supports and aesthetics.

Our ability and capability to manufacture five hybrid versions of our Flo-Motion® B011 door sets, each with one of the bi-parting doors sliding over the glazed screen and part of the wall, with the other sliding completely over a wall, enabled us to overcome all of the space saving issues too.

Overall, we manufactured, supplied and installed the following:

• 7 Flo-Motion B32O (bi-parting doors sliding over a wall)

• 18 Flo-Motion B01 (bi-parting doors sliding over glazed screens and walls)

• 5 Flo-Motion B011 (bi-parting doors with one sliding over a glazed screen and wall, the other over a wall)

• 1 Flo-Motion T100 (telescopic door)

Finishes:

  • Frames – Silver Anodised Aluminium (SAA)
  • Handles – Hoppe (RAL 7016 Anthracite Grey) back-to-back

    600mm x 34mm nylon handles

  • Glazing – 32.8mm Double glazed units with interstitial blinds (RAL9016 White) – magnet operated for “tilt and turn” only.

OUTCOME:

Our Flo-Motion® door-sets and our glazed panels provide many significant benefits for patients, staff and visitors to the new UECC at Scarborough Hospital, including:

  • Excellent light transfer to maximise the feeling of spaciousness.
  • Flexibility for clear patient/staff visibility or patient privacy with the

    integrated blinds

  • An attractive, efficient, effective & improved environment for staff, patients & visitors.

Axis Entrance Systems Case Study: Intensive Care Unit Redevelopment at Homerton University Hospital, in Hackney

View the Axis Entrances entry on BPindex

Visit the Axis Entrances website

INDUSTRY: Healthcare

CLIENT: Homerton Healthcare NHS Trust Foundation

CONTRACTOR: Quinn London

ARCHITECT: Hunters

PROJECT:

The redevelopment and upgrade of the Intensive Care Unit (ICU) at Homerton University Hospital, in Hackney, East London, to significantly increase the hospital’s capacity for accommodating critical care patients.

Working within the existing hospital footprint, this redevelopment and refurbishment included a reworking of the space to include:

• Six new isolation bed bays

• Areas for relatives

• A simulation suite

Our brief was to supply and install the doors to the six new isolation bays, as well as several glazed screens.

CHALLENGES:

The two big challenges for this project were the space constraints and working in close proximity to live clinical areas within this busy hospital.

SOLUTION:

Working closely with the project’s architects, Hunters and main contractor Quinn London, six Manusa bi-parting hermetic doors with integral blinds were specified.

The Manusa bi-parting hermetic sliding doors combine the advantages of an automatic door with the airtightness and hygiene required in clinical settings – perfect for healthcare environments.

Other features of these doors include:

  • The highest classification for air permeability
  • Maximum safety systems for people & operation
  • Obstruction-detection systems with automatic reopening & unlock for manual opening in power cuts

Additionaly, we fitted several glazed screens of various dimensions.

OUTCOME:

Our Manusa bi-parting hermetic sliding doors and the glazed panels supported the vision and work of the architects, Hunters and main contractor Quinn London by providing these significant benefits:

  • Excellent light transfer to maximise the feeling of spaciousness
  • Flexibility for clear patient/staff visibility or patient privacy withthe integrated blinds
  • Improved infection prevention with the hermetic doors
  • Improved protection from the door safety devices
  • An attractive, efficient & improved environment for staff, patients & visitors

“The Axis team was always at hand to engage with us as designers and explore appropriate solutions and the doors looked great”

Tim Ashton, Director at Hunters

T: 01604 212500         W: www.axisentrances.com

TORMAX Delivers Access Solutions to Prestigious Commercial Facility

Building Products Index Ltd Automated systems, Automatic door system Leave a Comment

View the TORMAX entry on BPindex

Visit the TORMAX website

As part of a major expansion, TORMAX was invited to return to the headquarters of De Soutter Medical Ltd – a decade after installing an automatic curved-sliding door to the main entrance – to enhance the facility with four additional automatic door systems.

A newly created main entrance features an impressive semi-circular, curved sliding door, like the initial installation. Two bi-parting sliding doors systems provide side-access to the building. In the warehouse, a double set of curved sliding doors work in tandem to create a D-shaped lobby, where small deliveries can be quickly and easily processed.

All entrances are powered by TORMAX iMotion 2202.A door drives. Uniquely engineered with a motor that features none of the working parts that generally wear out, such as gears or brushes, the iMotion 2202.A delivers exceptional reliability and longevity.

De Soutter Medical specialises in the development, production, and global distribution of high-performance, powered orthopaedic tools, for surgical procedures. At the UK headquarters in Aylesbury, Buckinghamshire, the company combines premium office space with advanced manufacturing facilities, as well as substantial landscaping and outdoor features that contribute to a positive working environment.

TORMAX worked with sub-contractor, Apic, and the architect, to deliver functional yet aesthetically impressive automatic entrances throughout the facility.

“TORMAX doors have well-deserved reputation for durability,” said Simon Roberts, MD for TORMAX UK Ltd. “The original system installed at De Soutter Medical is still performing reliably and the new entrances will continue long into the future. With minimal ongoing maintenance demands, our door drives have been known to last more than 25 years.”

As well as adding a prominent architectural detail to the front of a building, curved-sliding door systems are intensely practical, providing up to 40% more pass-through space than linear sliding doors.

In buildings with entrance pods formed by two curved sliding doors, like in the De Soutter warehouse facility, heat loss can be greatly reduced by programming the doors so that one is always closed. This setup ensures a continuous physical barrier against outside elements, helping to maintain indoor temperature.

Paddington Station Improves Assisted Travel Experience (June 2024)

View the TORMAX entry on BPindex

Visit the TORMAX website

A new lounge, that has been designed for Network Rail passengers using the assistance programme, has opened at Paddington station. TORMAX was contracted to work with Saper Glass to manufacture and install an automatic, single sliding door system, giving clear and easy access into the Assisted Travel Lounge (ATL).

Powered by the in-house designed TORMAX iMotion 2202 door drive, smooth and reliable operation is assured thanks to the innovative design of the high torque, synchronous motor that ensures rapid response to approaching foot traffic.

Featuring none of the parts that regularly wear out, such as gears and brushes, the iMotion motor offers a longer lifespan, with lower maintenance demands, than other similar door operators.

Designed by Isambard Kingdom Brunel, Paddington’s Grade I listed structure is one of Britain’s most historically significant railway stations. Appointed as main contractor, Consortia Group was responsible for delivering the new ATL, greatly improving accessibility within this major transport hub.

Situated next to the taxi rank on the station’s upper deck, the ATL provides a safe, convenient and accessible waiting room for passengers of restricted mobility. During opening hours, Network Rail’s Passenger Assistance team provide a customer ambassador to help individuals wanting to use the facility.

Ensuring the TORMAX automatic door opens and closes appropriately every time, speed settings and hold-open time can be easily adjusted by station staff via a user-friendly keypad.

Maximising system performance, an intelligent microprocessor control system guarantees permanent monitoring of door leaf movement, making automatic adjustments in response to say a build-up of debris on the floor.

“Travelling through a busy station can be challenging for those with additional needs,” comments Susan Evans, Network Rail’s head of passenger strategy for Western Route. “The Assisted Travel Lounge helps mitigate this by providing a friendly space for people to get the help they need from a dedicated team.”

1 2