Skip to content
BPindex — The Largest Building Products Directory in the UK

aircrete

AIRCRETE: BUILDING FOR THE FUTURE

Building Products Index Ltd Blocks, Concrete Leave a Comment

View the H+H entry on BPindex

Visit the H+H website

sh2192-0061To date, aircrete from H+H has delivered over 8,000 MMC homes in the UK, making it one of the most widely used materials for the Modern Building agenda. Jenny Smith-Andrews, Head of Marketing at H+H looks at the MMC solutions on offer.

There is no denying that the building industry, and particularly the housebuilding sector, in this country is extremely conservative: slow to adopt new methods and systems. Government clearly understands this. The degree of its intervention, in terms of overt encouragement and financial incentives is marked.

Whether it is any Government’s business to dictate to private sector organisations how they make their product is debatable, but the objective is laudable: to deliver better quality homes, faster, and H+H is well positioned to help its customers reach MMC targets.

sh2182-010Aircrete benefits from being a material widely used across Europe where housebuilding is a very different industry. Hugely popular for its robust, durable and thermally efficient characteristics, aircrete plays its part in the development of modern construction methods delivering high-performance homes.

In the UK, H+H aricrete is fundamental to three Modern Methods of Construction.  Our Thin-Joint blockwork provides a fast and accurate means of building exterior walls – meeting the criteria to be rated an MMC category 6.

sh2182-002Put together into a packaged offer combining Thin-Joint exterior walls with ground floors, upper floors and partitions, our Rå Build solution gives the entire weatherproof structure as a single, fast system.

Neither of these offers is new, both have been widely used in Europe for decades. However, in the UK, both have struggled to gain widespread adoption.  We certainly see more interest, given the focus on implementing Modern Methods, but for many, Modern means “offsite”. Our Celcon Elements, particularly when used as part of the i-House system, provide the answer that is gaining ground fastest.

Celcon Elements are storey-high panels of aircrete. Craned into place and fixed with Thin-Joint mortar, Elements allow the entire ground floor wall structure to be completed on site in just hours.

Barratt Longford Park Oct 16Elements, by the way, are not new either, so H+H has a track record of high-performing housing developments across Europe to reassure the UK market of the practicality of this building method.

Elements really come into their own when used as part of a system-build solution, and H+H worked in partnership with Roofspace Solutions to develop i-House™. This combines aircrete walls with prefabricated first floors and roof structures, installed by a dedicated contracting team.  Most suitable for large volume standard house designs, the entire building fabric can be completed within five days on site.

Celcon Elements with craneIn promoting our options for Modern Methods of Construction, H+H is highlighting a common misapprehension around the term MMC. There is no prescription as to the material used or the method of build. To qualify as a Modern Method of Construction, the solution needs to meet the objectives for building faster, more efficiently and to high tolerance. I-House meets the MMC definition at category two.

We know that our industry has a preference for aircrete – a trusted and popular material. 8,000 homes built with Modern Methods based on aircrete is a demonstration that this material is ready for the 21st century building agenda.

AIRCRETE AND THE MMC AGENDA

Building Products Index Ltd Blocks, Concrete Leave a Comment

View the H+H Ltd entry on BPindex

Visit the H+H Ltd website

Photography Tim Crocker

The fundamentals of aircrete as a material have not changed since it was introduced into the UK market over sixty years ago. However, it has proved its worth over time and now makes a strong case for inclusion as a Modern Method of Construction (MMC).

It is hardly a secret that since the publication of the dramatic “Modernise or Die” white paper in 2016, government focus has sharpened on the need to support methods of housebuilding that are faster and higher performance.

Much of the debate on the subject focuses on factory-build modular homes, but in fact the definition of MMC is much broader and there is certainly nothing to dictate which materials or method are preferable.

I-housesThe MCHLG definition makes it clear that it is focused on objectives and is not trying to be prescriptive as to what products or methods are used to achieve them.

Aircrete remains the preferred material for most UK housebuilders. Combining strength with inherent thermal efficiency, aircrete blocks are also easy to use on site and, most importantly, provide the flexibility that housebuilders need when planning their sites. The speed of build can be increased or slowed in reaction to demand or to weather conditions.

Elements installationStandard aircrete blocks with traditional cementitious mortar are typically used for cavity wall construction. Repeated performance testing demonstrates that such wall constructions are easily able to meet the U-Value requirements of current building regulations and the uplift anticipated when the revised Approved Document L is published.

Where increased airtightness is the objective, the highest performance levels can be achieved with Thin-Joint construction – which has been the preferred choice for various low carbon and Passivhaus certified developments.

The ultra-thin joint which gives the system its name is not only airtight, but also, having a much faster curing time, allows for increased speed of build. With higher tolerances, the method also supports a more accurate build. Both these characteristics contribute to the system being acknowledged as a Modern Method of Construction.

Aircrete with handsawWhere a more system-based approach is required – particularly for larger developments of standard house types for affordable or build-to-rent markets – H+H has developed an entirely different solution.

Based on Celcon Elements: story-high panels of aircrete, the I-House system was developed in partnership with Roof Space Limited. The concept was to develop a housebuilding system, based on aircrete, that allowed the entire structure of a house to be built on site within a week.

Celcon ElementsCelcon Elements provide the walls which are simply craned into place onto pre-prepared foundations. Prefabricated timber first floors and prefabricated roofs complete the structure and the package is finished with exterior insulation. Within a week there is a watertight shell, ready for interior trades to move on site and exterior finishes such as masonry to be applied simultaneously.

Recognised on introduction in 2017 with a Housebuilder award, the I-house system has also been supported with both BPOAS and NHBC warranties and is rapidly gaining ground as an advanced Modern Method of Construction.

For more information on aircrete and on the range of building solutions provided by H+H, visit www.hhcelcon.co.uk.

Sustainability and Significant Cost Savings with Celcon Foundation Blocks in Shrewsbury

Building Products Index Ltd Blocks, Concrete Leave a Comment

View the H+H UK entry on BPindex

Visit the H+H UK website

H+H_Logo_w_payoff_Green_CoatedH+H Celcon Foundation Blocks have been used in a new residential development in Shrewsbury. Sweetlake Meadow is well under construction, where a total of 175 new homes with two, three, four and five bedrooms are being delivered.

Shropshire based developer SJ Roberts Construction Ltd wanted to make sustainability a key priority for the project. It was their aim to make the new houses as environmentally friendly as possible, with enhanced thermal properties to reduce the cost of heating for the homeowners at Sweetlake Meadow.

IMG_0804Company Buyer Oliver Heighway explained: “The sustainability of H+H’s Aircrete Blocks speak for itself and aligns well with our inherent focus on ecological benefits: from sourcing of materials through to whole lifetime costs to the end user with reduced energy running costs.

“We’ve worked closely with H+H UK for many years and have established a good working relationship. Communication has always been a key part of this relationship, especially given previous supply issues with Aircrete products.

IMG_0819“Specifying H+H Ltd Celcon Foundation Blocks was therefore an easy decision, with guaranteed allocation from the manufacturer and stock locally, H+H can fulfil supply requirements through a number of avenues, which is imperative given time constraints of any development.”

Aircrete is often overlooked as a foundation material due to misconceptions about its load-bearing properties, however H+H Foundation Blocks are capable of comfortably supporting a three-storey residential building. Constructing foundations with aircrete can also deliver significant savings for the contractor.

An independent Cost Comparison Study by property and construction consultancy firm Calfordseaden found that simply changing the foundations to aircrete could reduce total build costs for a typical UK semi-detached three-bedroom property by almost 25%.

IMG_0770This is achieved through aircrete’s naturally quicker build speed which leads to reduced labour costs and the solid construction means that fewer materials are needed.

As the UK’s largest manufacturer of aircrete, H+H is able to provide full technical support throughout the lifetime of a project for specifiers and contractors. To find out more, visit the H+H website: www.hhcelcon.co.uk.

New EJOT fixing ranges steal the limelight at RCI

Building Products Index Ltd Fixings Leave a Comment

View the EJOT entry on BPI

Visit the EJOT Website

The new EJOT Concrete brick and Block range encompasses mechanical and chemical anchors applicable to all types of building substrate for diverse installation challenges.Those attending the recent RCI show at Coventry’s Ricoh Arena at the end of January, will have witnessed the diversity of fixing solutions for flat roofing, rainscreen systems and other construction challenges offered under this global brand; but the products are really only part of a holistic, service based technical offering.

We are all familiar with the map detailing the different exposure conditions to which structures are subjected, but it requires real expertise to translate wind speeds into the right fixing patterns and types. Crucially the EJOT range encompasses different options for mechanical and chemical anchors to suit all the common exterior substrates: including plywood, metal sheeting, brick or blockwork masonry and cracked or uncracked concrete.

By engaging with EJOT, contractors and consultants can access the company’s testing capabilities which will confirm the suitability of certain solutions to the location, the height or configuration of the building and the material which a rainscreen system or built –up roofing system is being secured into.

EJOT's new HTK2G 75mm diameter tubewasher, designed to meet SPRA guidelines for part-adhered membrane installationBrian Mack Technical Business Development Manager for EJOT UK Ltd “Globally EJOT is expanding its product offering relating to concrete, brick and block substrates: by consolidating our existing brands, through research & development, and from consultation with OEM’s and engineers. We have the products within the range to meet all installation issues into the different substrates, to tackle a wide variety of applications and performance criteria”

A further example of the latter would be the Trio ‘general application’ anchor for insulation materials, which is aimed at sub-contractors tasked, say, with securing insulation as part of a rainscreen installation. Described by Brian Mack as versatile and reliable as well as being very cost effective, Trio comprises two types of fixing pin, both of which combine with the same high quality sleeve.

New EJOT Trio ideal for general insulaton applicatoinsMeanwhile, the three Trio components can be used to fix into concrete or clay bricks including perforated types and aircrete blockwork. The 10mm diameter sleeve itself is manufactured from high density polyethylene to create a variable anchor zone, from 30 to 60 mm depth. The glass-reinforced nylon pin is intended to be used for securing lighter weight insulation such as expanded polystyrene back into brickwork or concrete. Then the metal pin will normally be used for heavier insulation types, though still being suitable for lighter EPS material. EJOT Trio then presents a generic, non-system specific product solution

Also prominent amongst the products showcased on EJOT’s stand at RCI the company was introducing its new HTK-75-2G 75 mm diameter tube-washer, for part-adhered flat roofing installations. Importantly it meets SPRA guidelines for bonded/mechanical hybrid installations and is suitable for securing insulation back into either ply or profiled steel decks.

EJOT’s technical sales engineers will advise on the correct fixing centres in relation to wind-load calculations, while the tube-washer and threaded fastener not only address cold-bridging concerns, but the telescopic design provides resistance to imposed loads.   With the insulation and membrane permanently secured using EJOT’s hybrid solution, the job is completed by folding and heat welding the laps.

With such a comprehensive collection of fixing products to choose from, and technical resources including site testing available to back them up, potential customers need to investigate the EJOT offering fully.

For more information email info@ejot.co.uk or call 01977 687040

1 2