Skip to content
BPindex — The Largest Building Products Directory in the UK

Building regulations

Ventilated fibre cement rainscreen cladding ‘Design Principles and Project Integration’ NEW RIBA CPD offered by Cedral

Building Products Index Ltd Cladding, Rainscreen Cladding Leave a Comment

View the Cedral entry on BPindex

Visit the Cedral website

Cedral’s new RIBA approved CPD is now available to book!

Specifying rainscreen cladding is a perpetual challenge for architects, balancing aesthetic goals, functional performance and regulatory compliance.

Modern fibre cement rainscreen cladding systems should comply and exceed strict fire safety regulations, ensure proper ventilation to manage moisture and condensation, and achieve energy efficiency and sustainability targets.

Adding to this complexity is the need to integrate the chosen cladding seamlessly into diverse building designs, from contemporary commercial facades to traditional residential developments, while adhering to tight project timelines and budgets.

Cedral’s latest CPD presentation “Ventilated Fibre Cement Rainscreen Cladding: Design Principles and Project Integration” has been designed to give architects practical guidance and design inspiration to ensure project success.

The learning objectives from the CPD will simplify rainscreen cladding specification, reduce risk and realise your aesthetic vision. Topics covered include:

  • History and performance characteristics of fibre cement
  • Key principles of rainscreen cladding; including the importance of ventilation and the benefits it brings to buildings
  • Specification support including installation options, technical support, building regulations, fire performance and NBS management
  • Project integration; including aesthetic options and functionality
  • Sustainable considerations

FIREFLY® FB180 Batt System Features in Glasgow Central Station Redevelopment

Building Products Index Ltd Fire Protection Leave a Comment

View the FIREFLY® on BPindex

Visit the FIREFLY® website

The first phase of a £5million investment by Network Rail in Scotland’s busiest station, has completed with the opening of Avanti West Coast’s new first-class lounge and ticket office. The first phase of the project involved the historic Caledonian Chambers area of the station which is on the east side of the concourse. Caledonian Chambers is a Category B Listed Building designed by Glaswegian architect, James Miller, and was completed in 1903. It was built for the Caledonian Railway Company.

Modifications and improvements were led by Network Rail and included the upgrading of the fire protection for the historic main structure, which required the creation of bespoke as well as standard encasement details for large steel beams by sector specialist, FIREFLY®. Originally opened in 1879, the first phase of this multi-million-pound property project included the creation of Avanti West Coast’s new ticket office and first-class lounge and a brand-new step-free Network Rail station reception on the concourse level. The wider project will see existing tenants relocate, new retail units created, and office accommodation refurbished.  Such has been the extent of past adaptations that when the project began last November, the design team was unclear as to the nature of the roof deck’s construction, until demolition of a fast-food restaurant revealed the I-beams up to 900mm deep.

Details originally developed by FIREFLY® parent company in Australia have been adapted to the requirements of the Building Standards (Scotland) and the Building Regulations, enabling the easy to cut and shape non-combustible FB180 batts to infill the web to different sized steel beams. The addition of fireproof mastic and additional layers and the special Ablative Coating complete an encasement which is able to offer 60 minutes or longer integrity and insulation.  The installation work within the station, which has remained operational throughout, has been carried out by Glasgow based QualiFire Passive Fire Protection, with SIG being the merchant stockist supplying all the FIREFLY® materials.

Active across Scotland and the North of England, QualiFire was set up by Joe Stewart in 2019 as a specialist in passive fire protection solutions for clients in the education, healthcare and local authority as well as other sectors, but has been using FIREFLY® products for the first time on the Glasgow project.

Joe commented: “The lounge and surrounding area is currently being fitted out, while our team continues to work elsewhere within the station. The FIREFLY® system was recommended by the project architects – IDP – and the client, as they had previously been unable to find a manufacturer offering a solution which could be guaranteed to protect beams, which could be a 100years old, in this sort of situation. Initially the fire curtains were considered but then it was decided to use FIREFLY® FB180 batts. I have had very good feedback from our installers, regarding the ease of cutting and fitting them, with very little waste generated compared to other similar products. We have used both the FIREFLY® intumescent mastic and the Ablative Coating across the entire surface. Overall, it was very flexible and effective, and we have had lots of positive comments about the work, not just from the client and consultants, but also the merchant, SIG whose manager has taken an interest.  We work on big public contracts like this as far down as London if required and I can see a big potential for the system.”   

FIREFLY® Technical Sales Manager for Scotland and Ireland, Daniel Gordon, explained: “There has been enormous focus on improving the fire performance of both private residential and public buildings in the past few years, both here in Scotland and across the rest of the UK – with specifiers urgently wanting to ensure compliance for the projects they are involved with. One result of this we have seen is the widespread use being made of our FB180 batt system as a much more dependable alternative to spraying structural steel beams with intumescent coatings: the thickness and quality of which is far more difficult to ascertain.”

Back at the outset of the project, the scheme project manager at Network Rail, Conor Mclaughlin, reported: “We are excited to be making this multi-million-pound investment to benefit passengers at Glasgow Central. We are changing the layout and occupation of several existing retail units on the station concourse which involves relocating tenants, creating new retail units, making some units larger and refurbishing office accommodation and we hope to create a broader range of retail for passengers and station users, thereby improving the experience at the station.”

Guide to the domestic UK Building Regulations and compliance standards for developers and specifiers and what the new UK Labour Government mean for housing and energy?

Building Products Index Ltd Heating, Hot Water Cylinders Leave a Comment

View the Kingspan entry on BPindex

Visit the Kingspan website

For specifiers and developers, keeping ahead of the latest developments and changes in Building Regulations and compliance standards is good practice that will never get old.

Householders rightly expect that Building Regulations will have been followed in construction of their new home, and that safety and compliance standards have been met. After all, it’s in everyone’s interest that new homes and everything in them and about them – heating, hot water and more – work reliably for years to come.

In this article, Andrew Ogden, Head of Technical Team at Kingspan Cylinders, guides you through the domestic UK Building Regulations and compliance standards that developers and specifiers must follow, focusing on heating and hot water.

Andrew explores:

  • What are the UK Building Regulations in England and the devolved nations?
  • What do the Building Regulations say about heating and hot water?
  • What other regulations and requirements do new build specifiers need to know?
  • What are the compliance standards for new build suppliers?
  • What changes will there be to UK Building Regulations in the future?

Read the full article here.

And if you’re interested in the new UK Government’s outlook on all things housing and energy, check out Andrew’s other article in which he examines the new UK Labour Government’s plans for housing, energy and business and what they could mean for developers, specifiers, local authority and social housing providers.

He gets under the skin of legislative priorities for the coming year and looks further ahead at what’s likely to be in the pipeline for the next five years.

Andrew gets into:

  • Housing, water and energy plans for 2024-25
  • Skills, employment and investment plans for 2024-25
  • Housing and energy priorities for the next five years
  • Employment and business priorities for the next five years

Read Andrew’s feature article here.

Have you found these articles interesting?

Let us know what you think about the new UK Government’s plans and if you agree with Andrew‘s interpretation by completing our short survey at https://www.surveymonkey.com/r/bpinov24

 

The importance of building regulations when installing a macerator, pump or lifting station for any project requiring waste discharge.

Building Products Index Ltd Macerator pump units, Pumps and Macerators Leave a Comment

View the Saniflo entry on BPindex

Visit the Saniflo website

Whilst macerators and lifting stations may not represent the glamorous side of the plumbing sector, they are nonetheless, some of the most useful products out there. Love them or hate them, they are transforming unused spaces and helping to add extra facilities to buildings all over the UK. And the largest units are taking waste from whole buildings whose facilities are below the levels of the public mains drains.

Building Regulations approval is a statutory requirement set by the Government in order to ensure that buildings are designed and constructed in accordance with regulations and associated legislation. Projects that require approval include:

  • Erection of a new building
  • Extension or alteration of an existing building
  • Loft conversions
  • Plumbing, drainage and ventilation windows, and fuel burning appliances of any type.
  • Many types of electrical works on buildings.

Building Regulations are designed to protect the health and safety of building users and for projects that require a macerator, pump and/or lifting station it is mandatory to adhere to Part G and Part H. While plumbers, contractors and installers should be fully aware of the regulations, it is incumbent on the customer to ensure compliance.

Part G and Part H Building Regulations

Part G covers sanitation, hot water safety and water efficiency. And, when adding facilities and discharging to a drain, part 4.24 is the key regulation to understand;

A WC fitted with a macerator and pump may be connected to a small bore drainage system discharging to a discharge stack if:

  • There is also access to a WC discharging directly to a gravity system
  • The pump meets the requirements of BS EN 12050-1:2001

Part 5.10 stipulates that a sanitary appliance used for personal washing fitted with a macerator and pump may be connected to a small bore drainage system discharged to a discharge stack if:

  • There is also access to washing facilities discharging directly to a gravity system
  • The macerator and pump meets the requirements of BS EN 12050-2:2001

Part H covers drainage & waste disposal and the important stipulations for pumps:

2.36      Where gravity drainage is impractical, a pumping solution will be needed

2.37      This should conform to BS EN 12050 in basements and BS EN 12056-4 for pumps located

inside buildings

2.38      Lifting station/pump installations for outside buildings should refer to BS EN 752 – 6 for

guidance on design

2.39      where foul water is to be pumped, the effluent receiving chamber should be sized to contain a 24hr inflow to allow for disruption in service. The minimum daily discharge of foul drainage should be taken as 150 litres per head per day for domestic use. For other types of building the capacity of the receiving chamber should be based on the calculated daily demand of the water intake for the building. Where only a proportion of the foul sewage is to be pumped, then the capacity should be pro-rata. In all pumped systems the controls should be arranged to optimise operation.

Saniflo has developed a CIBSE-approved CPD programme which is designed to discuss and offer technical training on macerators and lifting stations for commercial and domestic buildings, including regulations. Appointments can be booked via marketing@saniflo.co.uk