Skip to content
BPindex — The Largest Building Products Directory in the UK

Stannah

New Stannah Lifts website streamlines product selection to support contractors, architects and project teams

Building Products Index Ltd Lift, Platform Leave a Comment

View the Stannah Lifts entry on BPindex

Visit the Stannah Lifts website

Stannah Lifts Distribution & Service (LD&S), a leader in the UK lift sector, has launched a new commercial website that makes it easier for construction professionals to find the right lift solution.

Developed around the needs of architects, contractors and consultants, the site features a simplified structure, improved navigation, clearer product pages and more consistent data, making it easier to access technical information and identify the right lift solutions for different building types.

Replacing a website that served the industry for nearly a decade, the new platform responds to the growing need for accurate, accessible product data in building design and construction, which is essential for demonstrating compliance with building regulations.

Key improvements include:

  • Easy to navigate view of the complete Stannah product range in one place
  • Enhanced on-page product specifications that make comparing lift types, configurations and aesthetic options quicker and more intuitive
  • Sleek, unified product pages packed with consistent, project-ready information to support confident decision-making
  • Faster access to product technical documentation and gated resources that help architects, contractors and consultants specify with certainty

This updated approach ensures faster, more confident decision-making, whether customers are researching products, comparing specifications or downloading documentation.

Archie Hungwe, CEO of Stannah Lifts Distribution & Service, said: “Our new website gives the construction sector clearer technical information, simplifies specification and helps project teams quickly find the right lift solution. As construction demands evolve and our product offering have become more complex, we’re committed to supporting contractors, architects and consultants with the tools and resources they need to deliver high-quality, compliant lift installations.”

Built on a more flexible and scalable digital architecture, the website now allows Stannah to introduce new products and technical content more easily as the business expands its portfolio.

To explore the new website and Stannah’s lift solutions, visit: www.stannahlifts.co.uk.

Stannah Lifts dumbwaiters enhances food service efficiency at Beverley Holidays

Building Products Index Ltd Lift Leave a Comment

View the Stannah Lifts entry on BPindex

Visit the Stannah Lifts website

Beverley Holidays completes refurbishment of its restaurant with two dumbwaiters from Stannah Lifts, enhancing efficient operations at the on-site restaurant.

Open all year round, the Beverley Holidays in Devon welcomes guests seeking a fun-filled getaway with on-site entertainment, engaging daytime activities, a tasty range of food and drink options, swimming facilities, a wide-range of amenities, from EV charging points to laundry areas and stunning sea views of the South Devon coastline.

Works

Beverley Holidays has been a valued Stannah customer for two and a half decades, with Stannah Lifts maintaining their 50A model dumbwaiter, which had been in service for 24 years. As part of a recent kitchen refurbishment, Beverley Holidays chose to invest in more modern and reliable dumbwaiter models to improve food service and enhance overall operational efficiency.

Stannah Lifts worked alongside contractors and architects, Gutxi, to install two new dumbwaiters serving the kitchen on the ground floor and the restaurant on the newly extended first floor.

As this was a new installation, a prebuilt enclosure was constructed to house the lift and ensure it could be maintained over time. Once the installation was complete, Stannah returned to site to test, commission and UKCA mark the Microlift dumbwaiters, ensuring their safety for immediate operation.

The goal was to streamline the transit of food from the kitchen to the restaurant and enhance the guest experience, while working closely alongside the construction team and architects to ensure a smooth installation into both existing and new structures.

Challenge

Stannah Lifts attended an initial site visit and a detailed pre-order meeting with the construction team and architects to discuss the installation requirements and anticipated challenges.

One challenge was designing a dumbwaiter solution that would fit within a newly built enclosure attached to the side of the existing clubhouse. After comparing them with the actual built dimensions of the site, the dumbwaiter models originally envisaged for the project were found to be too wide to fit in the available enclosure space. Therefore, an alternative Microlift model with more compact dimensions was selected to ensure compatibility with the enclosure width.

Drainage systems and a mechanical cowling were also obstructing the proposed shaft location and needed to be rerouted and repositioned. The first-floor extension had to accommodate not only the two dumbwaiters but also provide adequate space for ongoing maintenance access. This involved close coordination with the site teams to ensure structural modifications, such as wall opening and shaft dimensions, were correctly executed.

The first-floor extension was revised to include sufficient space not just for the lifts, but for safe and practical access for future maintenance.

Solution

Stannah Lifts proposed the installation of two 50C dumbwaiters, which were better suited to fit the narrow shaft dimensions. These small service lifts are ideal for pubs, clubs and restaurant settings, enabling the efficient and safe movement of items between floors.

With an upgraded capacity of 100kg and reduced headroom of 2800mm, as opposed to the original 100B model specified which had a 3000mm headroom, this kitchen lift solution makes it easy to fit into the space available.

Built with removable stainless-steel shelf and infra-red heat lamps to keep food warm during transportation, the Microlifts are fully compliant with regulations, offering smooth operation rise and fall shutters fitted with safety locks.

The dumbwaiters installed in the restaurant are controlled with fully automatic push buttons at each entrance for ease of use.

Results
The two dumbwaiter service lifts were successfully installed and fully integrated into the extended structure on schedule. These Microlifts now play a vital role in minimising manual handling hazards and enhancing the efficiency of food service between the kitchen and restaurant, enabling quicker and more hygienic food transportation across floors.

Finished in a sleek grey baked enamel, the revised lift models fit precisely within the new shaft, with access points that complement the overall design.

Through close collaboration with the construction team and architects, from the planning phase to project completion, Stannah Lifts provided a bespoke solution that met all specifications and significantly improved the holiday park’s food service operations.

Stannah Lifts is proud to continue supporting Beverley Holidays with ongoing maintenance and repair services for the dumbwaiters. With twelve-month warranty and servicing included, including 24/7 emergency callout, Beverley Holidays can be confident that their dumbwaiter will remain in optimum condition, leading to fewer breakdowns, lower running costs and a reliable service overall.

Pete Allen, Platform Lift Sales Manager from Stannah Lifts Platform and Microlifts Division, said: “This project is a great example of how thoughtful planning and close collaboration can deliver a practical solution that enhance both operational efficiency and user experience. The successful integration of our dumbwaiters has transformed food service at the holiday park, and we’re proud to support their continued performance through our dedicated maintenance service.”

Gary Furneaux, Director from Beverley Holidays said: “The installation of the new dumbwaiters has made a significant difference to our kitchen and restaurant operations. Service is now faster, safer and more efficient, especially during busy periods. The team at Stannah Lifts were great to work with from start to finish, and their continued support through maintenance gives us real peace of mind.”

For more information, visit: www.stannahlifts.co.uk

Stannah Lifts deliver multi-lift project for Welcome Break’s 60th Service Station

Building Products Index Ltd Escalator, Lift Leave a Comment

View the Stannah Lifts entry on BPindex

Visit the Stannah Lifts website

Welcome Break opened its 60th service station at Junction 33 on the M1 in January, featuring a Stannah escalator, passenger lift and goods lift.

Spanning 32,000 square feet, located between Sheffield and Rotherham, the services offer state-of-the-art facilities, including dining options from KFC, Burger King and Starbucks as well as 28 EV charging stations and dedicated HGV amenities.

Designed to resemble a traditional Yorkshire village, the two-storey service station also includes retail, gaming, restrooms, seating, a children’s play area and remote workspaces. It marks Welcome Break’s first new motorway service in two decades.

Work

Stannah Lifts collaborated with principal contractors, HML Construction, architects Whittam Cox and SVM Associates on this £55 million project to create a cohesive lift solution and modern design that delivers an inclusive and convenient experience for visitors.

Back of house, Stannah installed a Goodsmaster lift to facilitate the safe and efficient transportation of goods between floors while improving workflow and minimising manual handling risks.

For front-of-house, a Stannah A2C escalator and a 13-person passenger lift were selected to optimise visitor traffic flow, improve accessibility and enhance overall experience.

Challenges

To optimise operations and resources, Stannah collaborated with teams across its divisions to ensure successful execution. Its Microlifts division installed the Goodsmaster lift, while the Passenger Lifts Division handled the passenger lift installation and the Major Projects Division oversaw the escalator.

This coordinated effort and meticulous planning ensured a seamless and efficient installation process, enhancing overall project delivery. As one of the few lift companies offering a full range of lift products along with comprehensive servicing, Stannah stands out as an ideal multi-project lift solution, streamlining customer communication, project specification and overall project management.

Solution

Passenger lift

To improve accessibility for wheelchair users and those less mobile, Stannah installed a 13-person stainless steel MRL (Motor Room Less) traction passenger lift from the Maxilift range, with a 1,000kg weight capacity.

Operating at 1.0 metres per second across two floors, the lift features efficient VVVF drives for a smooth, quiet and energy-efficient ride. Integrated remote monitoring ensures reliable operation, while LED lighting and standby shutdown contribute to an A-rating in BREEAM.

The lift’s design includes adjacent-opening, two-panel entrances, stainless steel walls and premium vinyl stone black concrete floor, providing a sleek and spacious feel. Equipped with intelligent controls, GSM connectivity and compliant with EN81-73 safety standards, it offers both safety and ease of maintenance, providing a future-proofed and high-performance solution for the service station.

Escalator

With the end user in mind, Stannah proposed its A2C escalator solution featuring a 1000m wide step to ensure maximum pedestrian flow during peak hours. Operating at 0.5 metres per second, a 30-degree angle offers a gradual transition from flat to inclined, providing a smoother and more comfortable ride.

The A2C-30 escalator is equipped with a toughened glass balustrade for enhanced durability, a hot-dip galvanised truss for improved protection in damp environments and an auxiliary brake for an added layer of safety.

Designed with efficiency and sustainability in mind, the escalator features speed monitoring that slows down when not in use. This is ideal for locations with varying traffic flow, helping to reduce operating costs and extend the product’s lifespan.

It also delivers a quiet and efficient ride with high efficiency and low maintenance, thanks to its low-vibration, low-noise motor and VVVF drive.

Goods Lift

To facilitate safe goods transportation, Stannah installed the Goodsmaster CD goods-only lift. This heavy-duty goods lift, capable of carrying 1,000kg, features a robust steel cladding structure with protective epoxy finish, non-slip aluminium checker plate flooring and bump rails.

Operating at 0.15 metres per second, the lift has front-facing entrances for easy loading and unloading. The Goodsmaster is supplied with interlocking car and landing gates to prevent load movement during travel, car safety gear and a load weighing device to prevent overloading.

The goods lift also includes LED lighting with an automatic timer for energy efficiency, ensuring long-term reliability and performance.

Results

The multi-lift solution provided by Stannah prioritises accessibility, safe operation and energy efficiency. Design was also an important consideration and Stannah collaborated closely with architects Whittam Cox to align with the original design scheme of this stylish new Welcome Break.

Lift Consultants, SVM associates commented “We were pleased to work with Welcome Break to provide the escalator, goods and passenger lifts in their new service station at Rotherham. Stannah were a natural fit as a delivery partner, being able to provide all products under one umbrella. The units have gone on to provide a reliable service for motorists and retailers alike.”

By offering both a passenger lift and an escalator solution, Stannah ensures full accessibility for wheelchair users and pushchairs, allowing easy movement between floors while maintaining smooth traffic flow, even during peak periods. A separate goods lift further enhances operational efficiency while ensuring customer safety.

Stannah successfully integrated three lift solutions into the building’s structure, completing the project ahead of schedule and within budget.

This cohesive and effective solution met the project’s diverse needs, ensuring seamless access throughout the building and efficient transportation of goods.

Continued product support

The Stannah East Midlands branch based in Mansfield, part of a nationwide network providing comprehensive lift servicing and support for all makes and models, is managing the lifts’ maintenance under the lift warranty, ensuring they stay in excellent condition with regular servicing. With the branch arranging on-site engineer attendance for the high-profile local opening day.

Archie Hungwe, Chief Operating Officer at Stannah Lifts, said: “Working with Whittam and SVM Associates, we were thrilled to be involved in this exciting multi-million-pound motorway service area project on the M1 in Rotherham for Welcome Break. I would like to say a big thank you to all our teams for working so hard on this project. After lots of hard work, it’s great to see the site open and ready to welcome the public”.

For more information, please visit: www.stannahlifts.co.uk/

Case Study: Newcastle United Football Club enhances fans’ experience with Stannah escalators

Building Products Index Ltd Escalator Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

Newcastle United Football Club, a cherished home for generations of fans since 1892, has introduced two new escalators as part of a refurbishment of its on-site merchandising outlet.

Through close collaboration with Newcastle United Football Club, the Stannah Major Projects team designed and delivered a bespoke escalator system, offering seamless transportation and significantly enhancing user experience.

Open seven days a week, the club’s refurbishment plans aim to celebrate and preserve its rich history and heritage while showcasing its widest range of football kits and merchandise, introduced as part of its £30 million partnership with Adidas.

The works

The project entailed a full refurbishment of the club’s shop following a £30m deal with Adidas as NUFC’s official kit supplier. This included removing the existing escalator, and designing and installing two new escalators to integrate with the updated layout.

Stannah Lift Services worked alongside 442 Design, a leading interior design company, to ensure the new escalators would seamlessly integrate into the architectural framework. Together, they identified necessary structural changes, including adjustments to the pit area to address conflicts between the stadiums’ structural supports and the original layout.

Stannah also carried out a detailed evaluation of the existing escalator and its surrounding infrastructure to find the best and safest removal solution. While the client liaised and initiated the removal with the demolition company, Stannah removed key components, such as the steps and drive unit, to facilitate easier manoeuvring of the escalator sections.

The challenge

The client set a tight budget and a strict timescale in order for the work to be completed in a timely manner and offer value to NUFC fans. To address this, Stannah provided detailed guidance on an escalatorlution that met the building and shop layout requirements while balancing cost and efficiency.

Stannah faced other challenges as logistics were disrupted due to conflicts impacting the Suez Canal, which made it unsafe and inaccessible for ships to pass through. As a result, logistic companies were forced to reroute deliveries around the Cape of Good Hope, causing significant delays in the delivery of materials. To mitigate further delays and to meet the store opening deadline, Stannah increased on-site labour resources to ensure the installation, commissioning and testing proceeded as planned.

The integration of the new escalators also demanded technical precision to address structural modifications to ensure the installation aligned seamlessly with the architectural framework and complied with rigorous safety standards. Extensive testing was conducted by Stannah’s engineers to confirm the escalators’ safety and performance, ensuring they met the BS115 standard.

Stannah provided comprehensive training on escalator operation, maintenance and safety to the building management team and store staff, providing all the skills and knowledge needed to manage and operate the systems efficiently.

The escalator solution

Stannah proposed the installation of two new A2C escalators to improve traffic flow between the ground and shop’s mezzanine levels, ensuring seamless access and greater convenience for users.

With a high-quality design, the escalators’ design focused on minimising friction, vibration and noise, delivering a smooth and quiet ride capable of efficiently managing increased foot traffic during peak periods.

To maximise energy efficiency and to provide flexibility on how the client would like to use the escalators, Stannah provided features such as stop-and-start technology and reduced speed operation so they can choose the correct operational philosophy to suit their current or future requirements. Star/delta bypass was also provided which provides redundancy in case of VVVF inverter failure.

Stannah’s A2C escalator package is a reliable solution for commercial, retail, hotel and office environments. With a rise of 3.0 to 15.8 metres and speeds ranging from 0.5 to 0.75 metres per second, these escalators are finished with a glass balustrade and natural anodised aluminium handrail guide frames for a modern and durable design.

Ryan Robson, Head of Projects, at Newcastle United Football Club, said: “The new escalators are a step forward to improving the efficiency of foot traffic around the NUFC. Stannah’s expertise and attention to detail throughout the process, from design to installation, were incredible. Their ability to deliver a solution tailored to our needs and manage challenges swiftly has been beneficial to the completion of this project.”

John Metcalfe, Project Delivery Manager at Stannah Lifts, said: “This project was an exciting opportunity to showcase our expertise in delivering tailored escalator solutions that seamlessly integrate into unique architectural environments. By collaborating closely with the client, we were able to address their specific requirements for increased foot traffic, while incorporating energy-saving features like the VVVF drive system.”

All of Stannah’s escalators are fully compliant with the latest British Standards, including BS5656 and BS115, and are equipped with the latest passenger safety features.

Find out more information on escalators and moving walkways or contact Stannah for a range of lift products and services at www.stannahlifts.co.uk.

Stannah unveils stylish new vertical platform lifts with more choice than ever before

Building Products Index Ltd Lift, Platform Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

Stannah, a leader in the UK lifts market, has unveiled an exciting new access lift range that offers vastly extended options, and which have been specifically developed for residential and commercial projects.

The new range of platform lifts offers the market more cabin sizes, options, finishes and accessories, plus a strengthened after-sale proposition, which includes a 2-year warranty.

In addition, the range is offered with ‘open protocol’ parts, so any lift maintenance company can maintain the lift, giving customers complete freedom. Alternatively, customers can choose a Stannah planned maintenance package.

Stannah Midilift CL offers a stylish, energy-efficient cabin platform lift that is simple to install and with a small footprint. It is a compact-sized hydraulic lift with a hinged landing door in a choice of panoramic or vision panel doors.

Midilift CLS is a stylish, hydraulic cabin platform lift with automatic sliding doors and the appearance of a conventional passenger lift with energy-efficient performance and space-saving design. Indoor and outdoor options are available. The automatic sliding door retains the look and feel of a passenger lift.

Both with a capacity of 5 people and a maximum travel of 12m (5 stops), they are ideally suited to public buildings, housing, retail stores, leisure, healthcare, offices, schools, existing buildings, and private homes.

Available with hundreds of car sizes and lift finishes, they require minimal building work and offer the flexibility of a structure or for wall-mounted.

Completing the extended lineup is Midilift PL, a simple, convenient, and versatile screw driven platform lift that provides simple step-free access in buildings where space is limited. It is suitable for up to 5 persons (340kg to 400kg) 12m (7 stops) or up to 3m for half height gate option.

Being screw driven means Midilift PL requires no separate cabinet, which is now included within the lift structure. It requires minimal building work and so enables quick installation time.

Mark Chapman, General Manager of the Platform and Microlift Division at Stannah Lifts, said:  “The new range is all about extending choice. Both in products offered and improved maintenance package. There really are compelling reasons why specifiers should take a look.”

All the new platform lifts are now live on the Stannah lifts website: www.stannahlifts.co.uk

Light-illuminated Stannah passenger lift inspires visitors at Winchester Cathedral

Building Products Index Ltd Lift Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah Website

Winchester Cathedral, a place of worship for over 900 years, has been brought up to modern accessibility standards with a light-filled passenger lift from Stannah. The installation now sits comfortably alongside the fine craftsmanship within the extraordinary Grade I Listed building.

This is one of the first passenger lifts to be installed in a medieval cathedral in the UK, paving the way for other heritage buildings to offer step-free access for visitors.

Central to this lift installation was working within the constraints imposed by the Grade I building of exceptional national, architectural and historical importance and with its own legislative requirements. As part of this, the lift had to be an honest 21st century addition to the cathedral.

The present cathedral was begun in 1079 and is one of the largest medieval gothic structures in Europe. It captures the architectural essence of the 11th to 17th centuries and has been a place of worship for over 900 years, having been a religious site for more than 15 centuries.

The cathedral is the final resting place for many, including Saxon royalty, William Rufus and Jane Austen, the novelist.

The £11.5 million invested by the National Lottery Heritage Fund scheme enabled the transformation of Winchester Cathedral’s South Transept into a fully accessible exhibition space rising through three levels.

 

The work

Between 2014 and 2019, Winchester Cathedral underwent an extensive conservation of the existing building materials and other adaptions to improve accessibility.

This included removal of modern elements in the South Transept to form a new exhibition space; improved learning facilities to aid understanding of its medieval heritage; reconfiguration of an existing 17th century staircase to create space for the lift shaft; a new mezzanine floor and staircase; and the installation of a Stannah passenger lift, which is the first in the UK to travel through a vaulted stone ceiling.

The lift shaft and car incorporated bespoke glass cladding where possible, featuring an interlayer of bronze mesh between the laminated glass panels that enhanced safety and complemented the colour palette throughout the cathedral. Stannah also crafted unique lift landing doors from the same type of glass, providing passengers with illuminated panoramic views as they ascend and descend the South Transept.

The thoughtful design complements the cathedral perfectly. The glazed cladding panels have had a powerfully positive effect on how the lift has been perceived and welcomed by visitors to the cathedral.

The challenge

The introduction of a lift to provide step-free access to the Morley Library in the South Transept was especially complex, both in terms of design and installation.

Firstly, being a place of worship meant that the cathedral had to remain open for the duration of the work, requiring a carefully planned approach to health and safety. Noise levels, too, had to be kept within agreed levels during the works to avoid disturbing visitors.

This meant that it was not practical to use mechanical excavating equipment to create the lift pit. This had to be carefully excavated using hand tools, initially by the cathedral archaeologist working alone, and in the final stages by a team working under his supervision.

The excavation revealed the original, 11th century footings of the walls and piers of this part of the cathedral, down to the level of the top of the piles that had been driven into the soft ground at the start of construction in 1079. A surface of flints in mortar 400mm below the present pavement was identified as a temporary working surface created during the construction of the Norman cathedral. Two exploratory boreholes were drilled in order to investigate the strata below the level of the actual lift pit.

In addition, a piling rig was required to create piles in the ground structure to house the lift’s hydraulic ram and this had to be brought to the South Transept in sections because of its size, and then assembled ready for use.
Creating the lift pit and pile allowed for the installation of a robust lift and the Stannah team collaborated with Nick Cox Architects to create a design that met all requirements.

The lift shaft travels through a late 11th century groin vault and this aperture was created by working with historical consultants. The Cathedral acted as principal contractor managing specialist subcontractors.

Given the historic significance and medieval construction of Winchester Cathedral, the passenger lift shaft structure had to be self-supporting, while maintaining a gap between the shaft and the groin vault it passes through ensuring preservation of the historic structure. This gap acts as a protective barrier preventing any potential mechanical damage that could be caused by vibrations from the moving lift.

The result

The installation of a bespoke Stannah passenger lift now provides step-free access to the Morley Library and Triforium in the South Transept, which contains a new exhibition space.

The first thing that strikes observers is that the Stannah passenger lift solution maintains existing levels of natural light within this part of the cathedral. The elegant design does this using glass cladding on the shaft and lift car, meaning that the glass is a physical barrier, rather than an optical one.

If the lift shaft and car had been designed with solid panels it would have blocked out natural light that illuminates the floor area below. In this way, use of glass cladding as part of a 21st century design, is one that would be respected by the original 12th century stonemasons.

When viewed from the ground floor the lift shaft and car are imperceptible to the observer, and approach that is enhanced by the use of bronze surrounds which harmonise with the other palettes in this medieval structure.
Using transparent materials also offers passengers an inspiring view as they ascend and descend through the cathedral, a very clever way of redirecting focus to the cathedral itself.

In 2021 this remarkable project wowed the judges securing four Royal Institute of British Architects (RIBA) awards; RIBA South Award, RIBA South Conservation Award, RIBA South Client of the Year Award and RIBA National Award. Prior to this, the project won the prestigious UK Heritage Award that celebrates the best historic sites and museums.

Nick Cox at Nick Cox Architects said: “Projects in historic settings stand apart from other work due to the high level of sensitivity required to respect the existing built fabric and ambience of the space. At Winchester Cathedral we had to deliver a technically complex piece of construction that respected the medieval architecture whilst clearly being a 21st century design. 

“The bespoke service offered by Stannah Major Projects was an integral part of achieving the design solution.   It not only achieved the primary aim of accessibility for all but also provided the aesthetic transparency we needed together with an operating system that preserved the tranquility of the space. It is a centrepiece to the overall scheme.”

Stannah Major Projects Division is a specialist area of the business that works on lifts for technically complex projects such as infrastructure, heritage and other sectors.

Architects and developers working on heritage buildings can contact Stannah’s specialist team for guidance on the different types of passenger lifts available for unique project requirements.

Image credits:

A touch of class: Stannah helps modernise historic entertainment venue

Building Products Index Ltd Lift Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

It can be said that every entertainment venue has a sole purpose: to transport their patrons into another world where their cares can be forgotten, if only temporarily. For those venues that wish to transport their guests to a bygone era of glitz and glamour, it can be challenging to strike the right balance between modern conveniences and historical preservation.

Lifts are a regular focus of this challenge in heritage buildings, and Blackpool Winter Gardens is no ordinary building. First opened in 1878, this Grade II Listed 3,000-seater entertainment complex has entertained countless millions throughout the history of the popular Lancashire seaside resort town. Like any other building with more than one level, the requirement to safely and reliably transport people from one floor to another, especially those with limited mobility, is an essential one.

The challenge

One of the lifts at the Blackpool Winter Gardens, located right next to the historic Opera House theatre, had been in desperate need of repair for a long time. Used to transport patrons up to the upper Circle and Balcony seating areas, it is an essential piece of infrastructure to allow step-free access to these sections. The existing OTIS passenger lift dated back to somewhere around the 1950s was only safely able to carry 4 persons or a maximum load of 380 kg, and looked very dated with its plain oak panelling.

The existing lift dated back to the 1950s and in looks did not quite match up to the richness of its surroundings.

Since the lift could not be repaired due to some of its components becoming obsolete, the lift had been long out of service until Stannah was selected to undertake a complete replacement.

“Stannah was the ideal choice for the replacement of our Opera House passenger lift, which had been out of service for over 12 months. Working with Stannah has been so easy, and constant communication was kept from start to finish.”

Philip Jackson, Head of Maintenance, Winter Gardens Blackpool

The client

Winter Gardens became a popular trend in the late 1800s in numerous seaside resorts and spas, and were so called because they offered the possibility of extending the fun and entertainment of the summer season into the cold and darkness of winter. The Winter Gardens entertainment complex in Blackpool includes a theatre, ballroom and conference facilities and has been rebuilt and added to many times over the decades.

The beautiful Art Deco interior of the Blackpool Winter Gardens Opera House, reconstructed in 1939, oozes sophistication and character.
The opulent interior of the Opera House, which seats a total of 3,000 people.

 

 

 

 

 

 

 

 

The Opera House is one of the UK’s largest theatres and continues to attract some of the world’s biggest touring shows and events to Blackpool. The iconic theatre has seen a host of famous stars on its stage since it first opened in 1939, including Frank Sinatra, Judy Garland and Shirley Bassey.

The result

The project manager from Stannah, Lee Mahoney, worked in close collaboration with the Winter Gardens’ head of maintenance Phil Jackson to design a lift that would complement the iconic architecture and decor of the first and third floors. Stannah also designed the brass plates on the landings to give a glamorous look to the control panel with its retro push buttons.

The new Stannah lift features reflective surfaces to add the perception of depth to the floor space of the lift, as well as touches that reflect the glitz and glamour of the Arts and Crafts Movement, such as brass panels and handles.

Stannah provided a new Xtralift passenger lift, which is much more energy efficient than its predecessor. It offers a capacity of 8 persons or a maximum load of 630 kg.

Although there were some challenges involved in the installation process, such as large heating pipes which had to be removed in the shaft, and having to avoid noisy works during opera and cinema shows on certain days, these issues were worked around with good communication on both sides, and the installation was completed in 8 weeks.

“Stannah has been great to work with from start to finish. They have impressed us so much that I am once again working with them on our replacement program for another two lifts.”

Philip Jackson, Head of Maintenance, Winter Gardens Blackpool

With its 150-year history, Stannah truly understands the importance of heritage, and with their Stannah Promise, also live up to their company values on a daily basis to offer Blackpool Winter Gardens the perfect mix of quality, safety, sustainability, reliability and cost-effectiveness.

Stannah introduce a new cost-effective passenger lift range

Building Products Index Ltd Lift Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

CoB2Making it easier to specify the perfect lift for your project

With a 150-year legacy of delivering lifts, Stannah, a UK company knows how to stay ahead of trends and keep focused on its customers’ needs.

Stannah Lifts has introduced a new range of passenger lifts that are cost-effective and much easier for professionals to specify according to their needs.

Introducing the straightforward Maxilift range – for cost-effective, quick to specify and install traction lifts. And Xtralift, our extensive range of fully customisable traction lifts.

Whether looking for a lift for a building project, selecting the right passenger lift can be a challenge. This is why Stannah Lifts has introduced a new range of entry-level passenger lifts that are not only cost-effective but also much easier to specify. With new interiors across the range and a tailored consultative approach on lift selection, Stannah has long been a favourite for construction professionals looking for more personal service.

MaxiliftSolusWith a 150-year legacy of delivering lifts to satisfied customers. A company that has been in business for this long knows how to constantly refresh products to stay ahead of construction trends and keep focused on its customers’ needs.

“We believe specifying the right passenger lift should be effortless. No one should have to compromise between performance, dimensions and design,”explains Alastair Stannah, Managing Director at Stannah Lifts. “That’s why we’ve simplified our offering into the straightforward Maxilift range – for cost-effective, quick to specify and install traction lifts. And Xtralift, our extensive range of fully customisable traction lifts.”

PB v2“While all our lifts are built to the same high standards and comply with all regulations, we know that some projects require a simpler specification, delivery and installation process,” continued Alastair. “We’ve improved the manufacturing of our most cost-effective traction passenger lift and have focused on the most popular finishes and sizes with our Maxilift range. It is the perfect entry-level lift.”

 

XtraliftSolusThe new core Xtralift range is designed to cater for projects that require much more flexibility, such as fire-fighting lifts for hi-rise housing and lifts that require an element of robustness, such as vandal resistant Category 1 and 2 compliant lifts. Or ensuring a lift meets a healthcare specification, fire-fighting or evacuation requirements, Xtralift products give construction professionals more choice across lifts for between 4 to 46 passengers. Irrespective of the finish required, Stannah lifts remain as hard-wearing and energy-efficient as ever.

New sleek designs

VF2The range also has brand new styling, a choice of finishes and new full height or half height car operating panels, plus smaller dimensions for the controller cabinet. The latest design of new displays with larger screens as standard, with optional TFT and remote update of multimedia content. Stannah specialises in creating beautiful bespoke lift finishes so we can design your lift to make a statement.

Whether you’re working with an existing lift shaft or developing a new building, there’s a Stannah lift to fit your space.
Why not take a look today – www.stannahlifts.co.uk/passenger

————————————————————————————-

About Stannah Lifts

Since 1867, Stannah has continued its family tradition; to keep people and goods moving. With more than 30,000 new installs per year and servicing over 92,000 lifts and stairlifts, they support customers right across the UK and have a dedicated service branch in Scotland. Stannah Scotland not only deliver on passenger lifts, but platform lifts, goods lifts, escalators & moving walkways, lift servicing and lifts for homes too.

Stannah Passenger Lifts For Hospice Extension

Building Products Index Ltd Lift Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

Stannah continues to support the local community with the installation of a bumper-size passenger lift in a brand new 2-storey extension to the Countess of Brecknock Hospice, a palliative care facility located within Andover War Memorial Hospital.

This is the second passenger lift installed in the hospice, with the first model delivering an equally efficient service in the original premises.

Time moves on. In 2020 we launch our latest passenger lift range under our well-known and much-loved names, with new technical features and improved car design.

CHALLENGE

To supply, install and maintain a passenger lift in the new extension to the Countess of Brecknock Hospice

Case study

Located within Andover War Memorial Hospital, the Countess of Brecknock Hospice is a specialist palliative care facility that opened in 1990. A Stannah passenger lift already operates in the main complex.

In 2019, a brand-new extension was completed to increase hospice’s care capability. To provide easy transportation around the 2-storey building, Stannah was once again the lift company of choice to supply, install and maintain a 33-person passenger lift.

The new lift delivers safe, efficient movement of patients, staff, visitors and equipment, including beds.

As the hospice is dear to many Andover-based Stannah employees for providing respite care to loved ones, the Stannah Group, which is active in the local community, funded a significant proportion of the new lift installation.

CLIENT: Hampshire Hospitals NHS Foundation Trust

PROJECT COST: £4.2 million

LIFT TYPE: A 33-person (2500kg), traction-drive passenger lift

CONTRACTOR: Amiri Construction, Fareham, Hampshire

ARCHITECT: Morse Webb Architects, Tadley, Hampshire

THE STANNAH SOLUTION

Stannah supplied and installed a traction-drive, 33-person, 2500kg-capacity passenger lift to deliver safe and comfortable movement of people of all mobility levels, including patients in beds or multiple wheelchair users, between the two floors of facilities

We delivered on every aspect of the project, from initial consultation through to project completion and 24/7, 365-day aftercare by Stannah Lift Services.

About the Stannah passenger lift

RS26398_Countess_of_Brecknock_008The lift car—interior design

Designed to complement the unit’s gentle, harmonious palette of pale grey walls and natural wood flooring, the lift enhances the safe, welcoming ambience.

Finished inside and out in robust satin stainless steel it is designed to take the knocks of daily use, and two floor-level bumper rails add an extra protective layer to the already resilient lift specification.

RS26409_Countess_of_Brecknock_019Safety

Intermediate support is provided by handrails to three-car sides. These assist user-safety and the manoeuvrability of cumbersome equipment, as does the anti-slip, black-sparkle PVC floor.

The autodialler (emergency phone) is pre-programmed to directly transfer any alerts to the dedicated telephone line in case of an emergency.

Compliance

The lift is designed and manufactured to meet the requirements of BS EN 81-73: 2020 Safety rules for the construction and installation of lifts, and fulfils the specifications of the Health Technical Memorandum on lifts.

It also helps the hospice’s owners meet the requirements of the Equality Act 2010.

RS26520_Countess_of_Brecknock_038Operational features

With small tendency vibrations and low-level noise emissions, the traction drive ensures that this heavy-duty lift delivers a smooth, quiet ride.

A key preference switch allows trained staff to override lift calls whilst the elevator is being used.

The two-panel, side-opening doors measure 1400mm x 2000mm and provide easy access for everyone involved.

The passenger lift was specified by Dominic Morse, Director at Morse Webb Architects, a RIBA Chartered practice operating throughout London and the Home Counties, comments:

​​​​“We targeted Stannah for the supply, installation and maintenance of a bumper-sized passenger lift as the Stannah Group is local to the project and so supportive and generous towards the Countess of  Brecknock Hospice. They are a Class 1 leading healthcare lift provider and delivered a seamless service from start to finish. Their ongoing lift maintenance package is integral to this service and   ensures that the lift operates reliably for many years to come.”

Support and maintenance

Stannah is a family-run company with total in-house expertise and a pedigree spanning over 150 years at the forefront of the UK lift industry.

This means that the Countess of Brecknock Hospice has the reassuring weight of a long-established, single-source lift company to keep their lifts working at peak performance.

As with all Stannah lift products, the new passenger lift is covered by Stannah’s comprehensive lift service plan. This includes 12 service visits in the first year, with continued lift maintenance by the South West England and Southern England branch of Stannah Lift Services. This forms part of our nationwide network providing comprehensive lift servicing and support.

RESULT

A fully accessible, user-friendly new extension to the Countess of Brecknock Hospice, all thanks to the new Stannah passenger lift. And a delighted client, as Michele Gard, Director of the Hospice Charitable Trust, comments:

“Stannah and its employees have been generous supporters of the hospice throughout its 30-year history. They provided the lift in the original building and now the new Stannah lift in our new hospice extension will ensure patients can be easily and comfortably transported between floors. We are so grateful for the support of Stannah – a local company helping the Countess of Brecknock Hospice to provide care for local people.”

WHY WORK WITH STANNAH?

The Stannah Promise

Stannah assures you that the team will do everything it can to live up to the family name and offer you the best products supported by a first-class service.

Our promise to you—“We are always true to our word”—is fundamental to how we operate as a group.

We guarantee safety at all times, we’re easy to work with, offer flexibility and expertise and always strive for the highest standards.

 

Guidance and advice on changing lift use

Building Products Index Ltd Escalator, Lift Leave a Comment

View the Stannah entry on BPindex

Visit the Stannah website

Modern passenger or cargo elevators, lifts with closed, opened and half closed, metallic cabins doors, floor indicators digits and glossy flooring in empty corridor 3d realistic vector illustration

In critical settings like hospitals as well as warehouses, supermarkets, lifts have provided vital support for the movement of people and goods and continue to do so. But elsewhere as companies have had to close doors temporarily… perhaps a longer time than we all hoped for and it’s impacted these buildings.

LOLER thorough examinations, scheduled lift maintenance visits, inactive lifting equipment; lockdown has impacted the basic operation and functions of a lift right across the UK.

With changing guidelines on lockdown, the need to adapt has continued. For the lift industry and lift owners, it’s meant new health and safety requirements regarding the use of lifting equipment.

That’s why we’ve compiled a series of blogs that follows the latest guidance. From escalator & lift cleaning; lift use during social distancing; FAQs – guidance for lift owners during Covid-19 lockdown; preparing your lift for reopening, we’ve covered most COVID related topics.

  • Advice on Leaving Your Lift Inactive – for safe lift travels, as more people are returning to new work normality, checking your “forgotten” and inactive lifting equipment is crucial.

We’ve also been busy innovating and have a range of solutions to help you effectively revitalise your lifting equipment as well as eliminate the spread of covid-19.

It’s business as usual at Stannah, we’ve updated all our practices and taking extra care, supporting our customers wherever and whenever we’re needed.

So if you need help with a lift, we’re ready, simply get in touch.

1 2